A project boundary is a well-planned fence which regulates movement and separates work zones and facilitates the safe functioning of industrial, commercial and building sites. The system should be appropriate to the site and topography, the desired degree of control, the layout of gates, the exposure environment and the desired service life.
Best International Contracting Company offers a fence work to specified project demands in Saudi Arabia. Being a fence installation contractor Saudi Arabia customers may turn to in order to offer them appropriate packages, BIC examines the approved layout, type of fences, height, post spacing, foundation and gates, coatings, access restrictions and required programme and then offers the work.
Some of the services we can offer include setting-out, post-installation, fixing of mesh or panels, braces, gates, approved security features, alignment and record of completion. Design of fences, structural calculations, security evaluation, access-control software and permission are not included, unless explicitly mentioned in the accepted contract.
The needs of fences vary with the use. A temporary construction boundary has other performance and relocation requirements compared to permanent industrial boundary, internal equipment enclosure or automatic entrance gate. The systems and interfaces of the system should be defined by the approved drawings.
BIC previews ground condition, level changes, corner, slopes, drainage crossings, underground utilities, access roads, position and connection of gates to existing structures prior to mobilisation. In case of the conflict between the alignment and a service, it should be obstructed or checked boundary, the conflicted part must be clarified and further installation must be made.
The customer will need to submit the approved fence route, site boundary information, necessary offsets and utility records available. Cadastral certification and establishment of legal boundaries is still within the proper survey process that is authorised.
Industrial Perimeter Fencing
Plants, warehouses, substations, yards, utility areas and project compounds may have to have permanent perimeter systems. The choice of fence must be indicative of the acceptable level of security, exposure to the environment, visibility, access to maintenance and gates.
KSA scope Our industrial fencing services can be setting-out, post foundations, posts, rails, mesh or panels, bracing, gates and final alignment. Coating systems, grade of material used and authorized security additions are verified via the project documents.
Chain-Link Fence Installation
Chain-link fences offer a convenient demarcation of industrial areas, construction compounds, storage and sporting or community facilities and internal separation areas. The system can be line posts, corner posts, straining posts, rails, tension wires and appropriate gates.
In chain link fencing Saudi Arabia projects, BIC verifies the type of mesh approved, the type of wire finish, the height, the spacing of the posts, the bottom detail, top detail and gate layout, before installing. There should be tension and alignment but not too much of sagging and distortion.
Welded Mesh and Panel Fencing
Where the appearance of the project is to be defined, or where the openings are to be controlled or where the fence line is to be more rigid, welded mesh or rigid panel systems may be chosen. The approved brackets, clamps or fasteners should be used to fix the panels.
Posts should be appropriate with regard to the terrain and panel width. Level change can necessitate graded panels or some other approved transition, or stepped installation.
Security Fencing
Security fencing can be necessary on the perimeter of controlled assets, industrial boundaries, utility installations and restricted compounds. The design approved may have more height, less openings, anti-climb design or security toppings.
Since KSA project teams are security fencing contractors, they can enter into a specific installation work, BIC adheres to the approved system, and does not decide on the type of security required on its own. The security risk assessment and system design is left to the customer or assigned specialist.
Temporary Construction Fencing
Temporary fencing assists in the separation of active construction zones, safeguarding stored materials, directing pedestrian traffic and regulating access when conducting a project. Systems can be free-standing, mounted on a post or be fixed by another approved method of temporary fix.
BIC offers temporary fencing services that Saudi Arabia projects may consider to have a defined work zone, compound and phased boundaries. The proposal determines the type of fence installed, installation, duration, relocation, scope of maintenance and removal.
Internal Segregation and Equipment Enclosures
The industrial and logistic premises might be in need of internal fencing of the machinery, utilities, dangerous working zones, storage areas or limited areas of operation. It should be enclosed with access gates, maintenance clearances and emergency routes.
BIC mounts the approved layout and is able to tie-in to appropriate existing structures. The design of machine guarding and process-safety assessment are not considered as part of the standard fence unless mentioned otherwise.
Pedestrian and Vehicle Gates
Fences packages can incorporate single-leaf, double-leaf, sliding or any other acceptable gate construction to allow pedestrians, light vehicles, and trucks and equipment access. Direction, clearance, hinges, stops and locks and operating area should be according to the site requirement. Gate opening width should be according to the site requirement.
The capacity of the gate posts and foundations may need to be higher than that of the line posts. The detail approved must include the consideration of the weight of the gate, the exposure to the wind, the frequency of usage and intended automation.
Automated Gates and Access-Control Interfaces
Controlled access at an industrial plant, a logistic yard, a compound and a commercial property can be supported with powered gates. An entire system can be the gate, operator, control panel, sensors, safety devices, cabling, earthing and connection to an access-control platform.
BIC can synchronize the approved civil, mechanical and installation interfaces, to meet automated gate and access control KSA requirements. All electrical supply, controls, programming, integration and commissioning are only provided when noted in the accepted proposal.
Service boundary: This page discusses the approved installation of fences and gates. Concrete foundations below major i.e. independently packaged foundations, custom manufacture of steel, power supply, controls and commissioning, Electrical Works. Access-control software, security-system design and land surveying are only provided upon request.
Installation of the fence ought to commence at an approved route and credible reference points. The alignment must determine the corners, direction changes, gate openings, offsets, crossings and connections to existing boundaries.
BIC has the ability to establish working line of fences using issued drawings and approved site control. Where there are particular setting-out, legal confirmation of boundaries or cadastral work needs to be done, the appropriate Land Survey Services scope must be contracted.
The project must ensure the underground utilities and necessary permits before excavation. The location of fence posts can require approved changes in cases where the services, foundations, drainage or other obstructions are in collision with the issued line.
Posts pass on to the supporting structure or the ground the weight of the fence and the gate. Post size, spacing should be in accordance with the approved design and consideration of fence height, type of system, soil condition, wind exposure and loads of gates.
Installation can be in the form of cast-in concrete foundations, baseplates attached to approved concrete, sleeves or some other detail. The proposal includes the foundation excavation, concrete, reinforcement, anchors and reinstatement.
Corner, terminal, gate and straining posts are normally in need of support. Installing braces, rails and connections where the system requires it should be done prior to mesh tensioning or the completion of the panel.
Mathew materials are supposed to be of the approved specification and the environment where they will be used. The project can specify galvanised or coated or painted or combined protection to posts, wires, mesh, panels, gates and fittings.
The material delivered must be inspected in terms of visible damage, wrong size, coating flaw and missing parts prior to installation. Long objects, panels, mesh rolls, operators and electrical accessories should not be distorted, contaminated and should not suffer unnecessary damages due to storage.
The approved repair procedure should be used to treat cut edges, drilled areas, and site welds, and damaged coatings. Substitutions of products have to be approved in the project.
Chain-link mesh needs to be put in place with a uniform degree of tension and firmly attached to terminal, corner and line posts. The fixing system chosen can comprise of tension bars, ties, clips, wires or rails.
The lower edge is supposed to be in accordance with the accepted clearance or ground detail. Unnecessary gaps, concealed mesh or jagged edges must be avoided unless it is necessary to the design.
Corners, level and slope changes must be planned to allow the mesh to be controlled and the completed line to be straight and not twisted.
The installation of gates needs proper alignment of the posts and sufficiently operating clearance. Position of the leaves, tracks, wheels, hinges, rollers, stops and locking points should be in such a way that the gate does not bind up.
Checks to be made on the manual gates are travel, closing position, latch engagement and stability. Checks on the use of the approved electrical and control scope are necessary with regards to powered gates.
Before final adjustment of the gate, road levels, drainage, approach areas and kerbs should be completed or coordinated. The changes in the future pavements can impact both the clearance on the ground and performance.
The temporary boundaries tend to vary due to the excavation, building and road construction and site logistics. Initial positions should be considered, probable relocation stages, access gates and responsibility of maintaining the fence, all of which the installation plan should determine.
Free-standing systems need to be based, to provide appropriate bracing and restraint against movement. Post mounted systems need a mutually agreed-upon excavation and reinstatement procedure.
Inspection should be done after the relocation of temporary fencing, impact, heavy wind or alterations of surrounding activities. Any damaged, leaning or unconnected parts are to be fixed immediately.
An installation of fences within a running plant or logistics facility can demand a gradual work, controlled excavation and vehicle management and constant access to vital locations. BIC develops appropriate work around the facility permit system, authorized working hours and work limitations.
Planning should include existing utilities, security systems, areas of processes and emergency routes. It is the customer who is in charge of validating access controls and security operation arrangements.
Prior to commencement of work, inspection of new fence connections to the existing systems in respect of level, condition and compatibility must be done. Poor or inappropriate current components might need to be repaired or replaced separately.
Checks can be route, spacing of posts, verticality, top positioning, foundation status, brace mounting, panel or mesh securing, tension, gate functionality, repairing coating, and overall cleanliness.
The approved inspection plan must point out hold points, sample areas, material records and documents necessary to be provided at hand over. BIC also organizes the work of the checks on the side of the contractors and submits the completed parts of it under the project inspection.
All misalignments, loose fittings, coated damage, projections or undone parts of the gate must be repaired during hand over.
Excavation, lifting, long materials, sharp wire edges, cutting, drilling, welding, powered tools and working next to live traffic or operating facilities can all be considered as fence work. The workspace layout needs to isolate workers/equipment, and other activities.
Post-hole excavation needs underground-service clearance preceding the underground-service excavation. The gate leaves, panels and rolls must be lifted and held by appropriate means to ensure they do not move freely.
Hot work and electrical connections, powered-gate testing and work around public or operating access points, must be subject to the appropriate permits and controls.
1.Enquiry and document review
We look at the fence plan, details of the system, quantities, gates, foundations, materials, finishes and date of completion required.
2.Location and path analysis.
Access, terrain, levels, and existing fences, utilities, approach to gates, drainage and work restrictions are considered where necessary.
3.Material and execution planning
The coordination of posts, mesh or panels, gates, fittings, foundations, equipment, labour and interfaces are done.
4.Setting-out and clearance
Corners and openings in fences, post positions and openings in gates are colored by approved references and clearance of excavations that are required is done.
5.Posts and supports
The approved foundation or baseplate detail is used to install line, terminal, corner and gate posts.
6.Mesh, panels and gates
The rails, braces, mesh or panels, fittings and gates are fitted in the order in which they are planned.
7.Alignment, operation and inspection
The completed fence undergoes line, level checking, fixing, tension checking, coating condition and checking gate operation.
8.Closeout and handover
Punch items, cleaning, records, removal of temporary work and area handover, are done in accordance with the contract.
Industrial and Petrochemical Facilities
Critical perimeters, enclosed internal areas, utility enclosures and appropriate control access gates.
Logistics Yards and Warehouses
Separating loading areas, boundary fencing, pedestrian gates and vehicle entrances.
Construction and Infrastructure Sites
Work-zone boundaries, temporary fencing and enclosures of storage and permanent project fencing.
Commercial and Institutional Properties
Appropriate perimeter, parking, service-area and access-gate requirements.
Utility and Energy Projects
Certified boundary and equipment-area fencing of substations and plants, corridors and project facilities.
Maintenance and Facility Modifications
Extension of fences, replacement of fences, relocation and alteration of gates and local repair within a specified scope.
BIC does not see fencing as a mere attaching of mesh or panels. The confirmation of the work plan is done by examining the route, ground, foundations, gate interfaces, materials and necessary handover.
Our civil, fabrication and electrical abilities assist us to comprehend the interfaces surrounding foundations, custom gates and powered access. All the responsibilities are still clearly identified in the proposal such that the page of fence-work does not engulf irrelevant specialist services.
We assist in long and short term needs with viable planning of access, stage construction and operation facilities throughout Saudi Arabia.
The enquiries on fence installation can be checked to appropriate industrial, commercial, construction and infrastructure projects throughout Saudi Arabia. BIC assists the requirements in Jubail, Dammam, Khobar and the Eastern Province in general and the projects in Riyadh, Jeddah and other areas could be evaluated based on requirements according to quantity, type of system, source of material, access, mobilisation, and programme.
BIC is able to assess chain-link, welded mesh, rigid panel, industrial security, temporary, internal segregation and appropriate gate engineering depending on project specifications that are approved.
Yes. Defined chain-link packages may comprise posts, rails, mesh, tension elements, gates, authorized security specifics and foundations as indicated.
Yes. Work zones, project compounds and phased boundaries can be provided and set up with temporary systems, and the task of relocation and removal agreed in the proposal.
Yes. Interfaces of gates and installation can be checked. Only those listed in the accepted scope will be considered as power, controls, safety devices, integration and commissioning.
Where indicated, they can include post and gate foundations. Big or separately designed foundations can be co-ordinated by the Civil Works service.
Custom fabrication may be organized by using the Fabrication Services of BIC and may be a part of a combined proposal when necessary.
The customer is supposed to give an accepted boundary or involve the duly authorised land-survey process. Legal ownership lines are not certified in the normal installation of fences.
Yes, where there is an approved system with an appropriate stepped, graded or transition detail and where access to the ground is safe.
After checking the current system and the connection points, suitable repairs, extensions, relocation and changes in the gates may be evaluated.
Please send layout, fence specification, length, height, gate schedule, foundation details, location, site conditions, finishes and programme required.
Provide the approved fence plan, system definition, quantities, gate schedule, foundation, project location and project programme needed. The materials, access, civil interfaces, installation sequence and handover requirements will be reviewed in our team in order to have a structured proposal.
In the context of industrial perimeter fencing, chain-link, temporary project perimeters, security fences or automated-gate installation interface in Jubail, the Eastern Province or any other Saudi-based project, submit to Best International Contracting Company the project documents available.
Provide the layout, type of fences, quantities and gate requirements and project programme.