The construction of industrial and commercial buildings should be based on the purpose of the building, design that has been approved, the site and the nature of operation. The structural elements, walls, roofs, doors, finishes and service interfaces must be planned in the right order to ensure the completed building is safe, functional and fit to occupy the building as planned.
Best International Contracting Company offers building construction services to Saudi Arabia project owners, contractors and industrial facilities to engage in specific building packages. Our projects can be of help in new buildings, extensions, internal alterations, architectural finishes, renovation and repair needs in appropriate project settings.
Prior to mobilisation, BIC checks the approved drawings, bill of quantities, structural details, finish schedules, workfront condition, material responsibilities, inspection requirements and required programme. The development of design, approval of authority and expert engineering is not transferred to the responsible consultant or project authority unless explicitly specified in the contract accepted.
A building package can include structural, masonry, roofing, doors, ceiling, flooring, waterproofing, painting, and a variety of interfaces with mechanical and electrical, plumbing, and fire-protection systems. Clear scope boundaries need to be clear before work takes place.
BIC compares the construction activities with approved information and agreed responsibility matrix. Work is conducted in controlled phases to ensure that any hidden objects, hidden components, access and service points have been inspected prior to being sealed.
Bulk excavation, deep foundation, road construction, specialist steel fabrication, mechanical system, electrical system and piping package, are all still part of their respective services unless combined as a written proposal.
Structural Concrete Superstructures
Construction can involve reinforced concrete columns, beams, suspended slabs, staircases, walls, equipment plinths and other elements on top of the foundations as depicted in the approved drawings.
Formwork, reinforcement, embedded items, placing of the concrete, curing and inspection must be in line with the accepted project documents. The construction of the foundation is aligned to the Civil Works scope, and is only here where the building package expressly delegates it to BIC.
Blockwork and Masonry Construction
Masonry may involve outside walls, inside walls, service-room walls, parapet walls and shafts and infill spaces with the official block or masonry system.
Before work is done, the wall lines, thicknesses, openings, lintels, ties, reinforcement, movement joints and attachments to structural components must be examined. Embedded items and service openings need to be aligned with the concerned disciplines.
Structural Steel Building Interfaces
Approved structural steel frames, secondary members, stairs, platforms, canopies or support components supplied to the project are some of the building packages that are installed.
Being a structural construction contractor Saudi Arabia project teams have the ability to bid on appropriate packages, BIC co-ordinates erection interfaces, line and level, anchor positions, bolts connections and approved site works. Standalone fabrication will be under the Fabrication Services page.
Roofing and Weatherproofing
Roof work can include approved sheet systems, insulated panel, waterproof membranes, flashings, gutters, downpipes, roof penetrations and other related accessories.
It is to be installed with the proper falls, laps and fixings, terminations and drainage interfaces to the roof. Before final waterproofing is done, the coordination of mechanical equipment supports, ducts, cable entries and other penetrations should be finalized.
External and Internal Plastering
The plastering or rendering offers a ready base on which paint, tiles or other acceptable finishes can be applied. The substrates must be clean, stable and prepared to accept the given system.
The thickness, reinforcement mesh, corner beads, joints, curing and final tolerance must be as required by the project. Unstable backgrounds or cracks ought to be evaluated prior to completion instead of being covered.
Floor Screeds, Tiling and Floor Finishes
Constructions of packages can consist of floor screeds, ceramic or porcelain tiles, skirting, approved resilient finishes, protective coatings or other planned floor systems.
Before installation, a check should be done on the subfloor level, moisture condition, slopes, movement joints, drains and service penetrations. Only where there is a clear definition of the material, preparation requirements, and performance requirements are included are specialist industrial flooring systems provided.
Ceilings and Internal Partitions
Appropriate projects might need the use of gypsum-board partitions, suspended ceilings, access panels, bulkheads and similar finishes. Layouts should liaise with doors, glazing, lights, ducts, diffusers, sprinklers and other over ceiling services.
Before installation, type of framing, specification of boards (fire or acoustic rating), access requirements and level of finish must be verified as per the approved schedule.
Doors, Windows and Glazing
BIC is able to install approved metal, timber, aluminium or other specified doors, windows, frames, glazing and hardware, as part of the building package.
Before final installation should be checked openings, sill level, frame fixing, sealants, ironmongery, door swings, access requirements and adjacent finishes. Electrical coordination or system coordination is required to have powered doors and specialist access-control systems.
Service boundary: building structure, envelope, finishes, renovation and repair are discussed on this page. Bulk earthwork and large foundations are included in the Civil Works; custom steel work is included in the Fabrication Services; mechanical, piping, plumbing, electrical and fire-protection system is included in the respective service packages except where specifically listed.
The buildings used in industries may require convenient layouts, durable finishes, restricted access and coordination of the equipment with the performance of the plant systems. The most common needs might include workshops, stores, utility buildings, control rooms, offices, shelters, warehouses and ancillary facilities.
Being an industrial building contractor KSA customers can go to to have specific packages, the BIC plans are based on the site permits, operational constraints, material movement, temporary access, adjacent activities and phased handover.
During planning, existing utilities, process equipment, emergency routes and shutdown windows should be identified. Any linkage to live services should be in accordance with the established isolation, permit and specialist implementation procedure.
The construction of shells, internal partitions, ceiling, flooring, doors, glazing, painting and selected external works, may be needed in commercial and institutional projects. The package must be on approved drawings and definite finish schedule.
BIC is capable of working as a commercial building contractor Saudi Arabia project teams hire to handle appropriate construction, extension or fit-out projects. Some of the trades, material responsibilities, samples, mock-ups, inspections and exclusions are identified in the proposal.
Furniture, specialized equipment, loose fixtures, branded systems and those provided by the tenant are only included where they are listed in the accepted scope.
The process of re-modeling need not be considered as much as a new building since the building might not be as per the drawings or can be hidden behind finishes. Wall, slab, roof, service, and waterproofing and past-repair conditions must be checked prior to the final method being determined.
The KSA scope of our building renovation would have the following; controlled removal of finishes, partitioning, ceiling renewal, floor replacement, waterproofing repairs, painting, door replacement, local concrete or masonry repair and reinstatement.
Asbestos or hazardous-material handling, structural alteration, live-service relocation and major demolition must be assessed and controlled separately and by specialists. BIC does not take the risk of hidden conditions which were not reasonably discoverable at the time of the commencement of work.
Repairing of buildings might be necessary due to impact, water intrusion, ageing finishes, movement, corrosion or unapproved alterations or incomplete work. A fix should be based on the discovered cause as opposed to the apparent symptom.
Appropriate work can consist of local concrete repair, blockwork repair, crack repair as per an approved procedure, plaster repair, roof repair and sealant repair, replacement of damaged finishes and repair around service modifications.
In cases where structural capacity or fire performance, waterproofing integrity or building safety might be at risk, the responsible engineer is to evaluate and authorize the repair approach to be used prior to doing so.
The architecture finishes outline the look of the finished spaces, ease of cleaning and usability. Installation of paint, tiles, ceilings, partitions, doors and sealants can be done only when the substrate and the surrounding work is prepared.
Approved colours, samples, schedules and details of finish should be availed in the project. Before production is completed it can be necessary to have sample areas or mock-ups.
Post completion protection is crucial. Protective measures should be applied to finished floors, walls, frames, glazing and fixtures to avoid damage during subsequent construction until the process of handover.
Roofs, wet areas, external walls, joints, planters, below-grade interfaces or other areas indicated in the approved design might need to be waterproofed.
The receiving surface, falls, corners, penetrations, terminations as well as protection layer should be appropriate to the chosen system. Before the work is covered up, inspection or testing must have been done.
The sources of water ingress can be roofing, plumbing, drainage, joints or external. It is necessary to identify the source prior to the selection of repair material.
Painting can be either internal, external, ceiling, door, frame and some selected parts of the building. Surface preparation must be done regarding dust, laitance, loose coating, moisture, cracks and visible defects.
The approved system and colour schedule should be used to follow by primer, intermediate and finish coats. Coverage, drying time, and environmental conditions and protection against dust or damages should be regulated.
Specialised chemical, fire or performance requirements of the industrial protective coating are only included where the specific product system and preparation standard are mentioned.
Jubail projects can include new support structures, extensions of facilities, warehouses, office, utility structures, renovations and upgrades in industrial or commercial sites.
Being a building works company that Jubail customers can approach to meet the appropriate needs, BIC reviews access, permits, working hours, material storage, temporary facilities, security measures and interface with the current operations.
The execution can be done in phases in which the facility will have to continue being operational. Before mobilisation, work areas and temporary partitions, dust control, access routes and handover stages should be agreed.
The construction work has to liaise with mechanical, plumbing, drainages, electrical, fire-protection, and communication systems. Prior to closing concrete, blockwork, ceilings or finishes, openings, sleeves, inserts, supports and access panels must be verified.
Routes of services and duties should be found in the approved coordination drawings. BIC displays any conflict in terms of project process as opposed to altering the design without consent.
Testing, commissioning and final connection of specialist systems will not be part of the building contract, unless specified in the assigned trade.
Not only should it be inspected at the end of the construction, but also during the construction. Common checks can include the approval of materials, setting-out, reinforcing, formwork, embedded, concrete, masonry, waterproofing, finishes, doors, and final alignment.
In the inspection and testing plan, hold points, witness point, sample, mock-ups and mandatory records are to be identified. Hidden work must be examined prior to covering.
An appropriate method should be used to correct non-conforming work and record it. The ultimate acceptance is dependent on the contractual inspection of the project.
Construction construction is a trade that includes height work, lifting, scaffoldings, openings that are temporary, cutting, drilling, hot work, chemicals and various trades that are located in common areas. The environment of activities and sites should be reflected in the workfront controls.
Renovation within facilities that have people or are operational might necessitate isolation, dust containment, noise abatement, secure access, limited working hours and daily cleaning.
Temporary structures, access scaffolding and lifting set ups are designed and checked based on the applicable approved procedures.
1.Investigation and research of documents
We look at the approved drawings, bill of quantities, specifications, finish schedules, workfront condition and required programme.
2.Interface planning and site assessments
Access, Structures, utilities, operating limitations, storage and temporary works and discipline interfaces are checked.
3.Submittals of materials and methods
Products, samples, mock-ups, work methods, inspections and proposed sequencing are aligned with the project requirements.
4.Setting-out and workfront preparation
Lines, levels, openings and work areas are verified prior to construction or renovation work.
5.Enclosure and structural works
Approved concrete, steel interfaces, masonry, roofing, doors, windows and envelope activities are implemented one by one.
6.Architectural finishes
Finishes that are scheduled such as plaster, screeds, tiles, ceilings, partitions, painting among others are done once substrates are accepted.
7.Inspection and corrective work
Finished processes are verified, punching records are made and necessary corrections are done.
8.Final cleaning and hand over
The protection is stripped and areas cleaned, documentation is prepared and the completed building package is handed over.
Industrial Support Buildings
Workshops, shops, utility buildings, control rooms and other appropriate support facilities.
Warehouses and Logistics Facilities
Construction of shells, building interiors, loading-area interfaces and renovation needs.
Commercial and Office Buildings
Approved design information based structural, architectural, fit-out and repair packages.
Site Offices and Project Facilities
Building work and infrastructure work Permanent or appropriate semi-permanent.
Maintenance and Plant Buildings
Making additions, renovation, repair and modification in controlled industries.
Institutional and Service Buildings
Appropriate construction, completion and renovation of specific plants.
BIC has a coordinated approach to building work, a construction package consisting of structure, envelope, finishes, and trade interfaces and inspections. We set work and customer responsibilities included before mobilisation.
Our larger civil, fabric, mechanical and electrical strengths assist us to comprehend multidisciplinary interfaces without blending unrelated expert services into this page.
We assist in new construction, renovation and repair needs whereby pragmatic planning of industrial locations, commercial projects and running facilities is done in Saudi Arabia.
Construction of building projects in Saudi Arabia may be checked to conduct appropriate projects. BIC serves needs in Jubail, Dammam, Khobar and the Eastern Province in general and projects in Riyadh and Jeddah among other areas can be evaluated based on scope, quantities, sourcing of materials, access, mobilisation and programme.
BIC can go through appropriate packages that deal with structural building work, masonry, roofing, partitions, ceilings, flooring, doors, windows, painting, waterproofing, renovation and repair.
Yes. Determined packages of industrial buildings can be evaluated against the approved design, workfront, operating restrictions, quantities and required programme.
Yes. Appropriate commercial building, extension, fit-out and refurbishment requirements may be discussed in case of approved drawings and finish information.
Yes. Phasing of the work can be done based on access, occupancy, dust, noise and operational limits where the conditions at the site permit.
Foundations are only provided where it is evidently designated in the building package. Civil Works are usually a coordination of major foundation and earthwork requirements.
These are distinct services except those that are included in a joint proposal. Building work liaises openings and sleeve and access needs with the specialist trades identified.
Appropriate repair may be discussed once the probable cause and system affected is determined. Approved engineering method may be needed to make a structural or specialist waterproofing decision.
Yes, in which the approved types, sizes, hardware, opening specifications and finish specifications fall under the scope.
Product submittals, colour schedules, samples or mock-ups may be necessary in projects. Installation is done fully on receiving the necessary approval.
Enclose architectural and structural drawings, bill of quantities, specification, finish schedules, project location, information and required programme of existing conditions.
Disseminate the approved drawings, bill of quantities, finish schedules, project location, existing conditions and programme required. The structure, enclosure, architectural finishes, trade interfaces and execution conditions required by our team to review to make a structured proposal.
To obtain the specialised building work, renovation, repair or extension of commercial buildings, new industrial buildings or extensions in Jubail, Eastern Province or any other Saudi location, submit the project documents available to Best International Contracting Company.
Send drawings, quantities, finishes, location of project and needed programme.
Request a Building Construction Proposal →Have questions or need assistance? Reach out to us—we're here to provide the support and information you need, every step of the way.
Copyright © 2024 Best International Contracting Company, All rights reserved.